Contractors for energy, offshore & engineering projects

Your project.
Our margin.

YRproject reads your project — whichever side of the table you sit on. The agency's cut is the number nobody in technical contracting gets to see. Here it is the first thing you see: your rate kept in full, our fee on top, in public, stepping down as the project runs. Move the numbers — client and professional are looking at the same stream.

The client pays €133,475 for 1,200 h100%

= €760 per 8-hour day

≈ 7 months full-time · 150 days of 8 h

Special cases
Client pays, on average
€111.23/h

€133,475 in total

Professional receives
€95.00/h

€114,000 · 100% of the rate named

YRproject keeps
€16.23/h

€19,475 · 17.08% on top of the rate

The fee steps down: 20% → 15% → 12%fee on top of the rate, by hours worked
  • First 500 h · 500 h at 20%€9,500
  • Next 1,000 h · 700 h at 15%€9,975
  • Above 1,500 h · 0 h at 12%—
  • YRproject keeps€19,475

The starting figures (€95 an hour, 1,200 hours) are an example to show the arithmetic, not a market rate. A day rate counts as 8 hours. Every rule and worked example: Open book.

Radar

The project world, live.

Where the work is, before it becomes a vacancy. Energy projects around the world from open, licence-checked data — who builds it, which phase it is in, what comes next. Every object carries its source; coverage differs per region and the map says where.

Deep-dive: the North Sea, liveFollow an area

Radar · tender calendar

Next on the calendar.

Dated steps in tender, licensing and allocation rounds worldwide, as published by the authority that runs them. Dates can move; every row links to its source.

  1. window closestoday

    France offshore wind tender AO10 (eleven projects, fixed and floating)

    France · North Sea & NW Europe

  2. window opensin 15 days

    Netherlands SDE++ 2026 application round (incl. CCS categories)

    Netherlands · North Sea & NW Europe

  3. Oil & gas licensingSource: C-NLOER
  4. window closesin 34 days

    India OALP Bid Round X

    India · Asia-Pacific

  5. window closesin 45 days

    Algeria Bid Round 2026

    Algeria · Africa

    Oil & gas licensingSource: ALNAFT

Full calendar

Three steps. Nothing under the table.

The same numbers go to both sides. If the client knows the rate and the professional knows the invoice, there is nothing left to hide a margin in.

  1. The professional names a rate.

    And keeps it, in full. We have no reason to squeeze it: our fee is a percentage on top, so a lower rate would only lower our fee too.

    100%of the rate
  2. Our fee goes on top, in public.

    20% for the first 500 hours on the project, 15% up to 1,500, 12% after that. Shorter than three months or an executive role: 20% flat.

    20 → 15 → 12%
  3. One invoice, both lines visible.

    The client pays within 30 days. The professional is paid within five working days of that payment arriving.

    5working days to payout

Read the open book: every rule, every worked example

Same service. Different arithmetic.

What changes when the intermediary's margin stops being a secret.

QuestionYRprojectTraditional agencyBroker / MSP layer
Is the margin visible?To both sidesSame sheet, same invoice lines, for client and professional.Usually to neitherTypically 15–25% per hour worked, undisclosed.1 In the UK, recruiters put client-set agency percentages at 10–35%.2Usually to neitherMargins stack when intermediaries chain: up to around 40%.1
Who pays the fee?The client, on topThe professional keeps 100% of the rate named.The gap pays itThe difference between what the client pays and what the professional gets. Neither sees both numbers.Several gapsEach layer takes its own share of the same hour.1
Does the fee taper?20 → 15 → 12%Marginal, by hours on the project. Published.Not that we could findNo published tapering scale in technical contracting.3Not that we could findSame review, same result.3
Are the terms public?YesFee table, payment terms and a terms summary are on Open book. The full contract text follows.Not publishedOn the sites we reviewed.3Not publishedOn the sites we reviewed.3
  1. Director of Planet Interim, quoted on Consultancy.nl: intermediaries take “veelal tussen 15% en 25% marge per gewerkt uur”, stacking to roughly 40% when several are involved. consultancy.nl
  2. A City recruiter quoted by ContractorUK: the agency percentage is usually fixed by the client, normally somewhere between 10 and 35%. contractoruk.com — “Agency commission: how much do agents take?”
  3. Our own review of the public websites of around 30 staffing suppliers in technical and energy contracting, September 2026. None published a contractor margin or a tapering fee. If yours does, tell us and we will correct this table.

Why YRproject exists.

The market for independent professionals has become unnecessarily opaque. A professional names a rate. A client pays an invoice. In between, fees and margins are added that one side — and often both — cannot see.

YRproject thinks the intermediary has a role to play. Finding the right people, understanding the project, handling the process and bringing both sides together has value. But that value does not need a hidden price.

So YRproject works differently. The professional sets the rate. YRproject puts its fee on top and publishes how that fee works. Client and professional see the same numbers.

The intermediary stays. The hidden margin goes.

Where we work.

Engineers, supervisors, commissioning leads, planners, QA/QC, HSE and project managers — for the projects that build and run the energy system. What a role requires depends on the assignment, and is stated with it.